Запис Детальніше

ПУТИ МОДЕРНИЗАЦИИ КОНСТРУКЦИЙ ПЛАНИРНОЙ ШТАНГИ

Електронний архів E-archive DonNTU – (Electronic archive Donetsk National Technical University)

Переглянути архів Інформація
 
 
Поле Співвідношення
 
Title ПУТИ МОДЕРНИЗАЦИИ КОНСТРУКЦИЙ ПЛАНИРНОЙ ШТАНГИ
THE WAYS OF DESIGN MODERNIZATION OF LEVELING ARMS
 
Creator Ильченко, Дарья Васильевна
Веретельний, Святослав Петрович
 
Subject экологическая безопасность
повышение эффективности коксования
планирная штанга
угольная шихта
плотность загрузки
load density
environment
leveling arms
coal blend
 
Description Рассмотрен вопрос модернизации существующих конструкций планирной штанги для повышения плотности угольной загрузки в камерах коксования. Приведены сравнительные характеристики существующих конструкций планирных штанг.
The question of upgrading existing constructions of leveling arms to increase the density of the coal loading in the coking chambers. Comparative characteristics of existing constructions of leveling arms.
Planning for the coal loading coke ovens is an important operation which largely depends on the effectiveness of the further process of coke production.
Under the production efficiency of coke oven productivity meant cameras, improving the quality of coke, reducing the coke cost per ton and improves the environmental performance of the process.
The planning process consists of the following: in the final stage of the boot under the boot of coking chamber holes are formed cones of charge while the holes are named void. It was at this moment and begins planning for and has tried many variations of alternating loading of the bunkers, and driving modes leveling arm. Previously the construction boom has been neglected in terms of increasing the density of loading. The main objective was to ensure strength and durability of the rod. Therefore, the bar was simple, cooked and made of relatively cheap steel. The low level of maintenance and reduced durability of the bar did not allow any way to control the planning process.
Plan for coal blend can have a positive direct impact on the efficiency of the coke production provided the technology planning process and design leveling device and in particular leveling arm will meet the necessary requirements. The effect of increasing the density will intensify substantially when using at boot time in the furnace chamber of special design leveling devices.
 
Date 2013-04-11T16:34:43Z
2013-04-11T16:34:43Z
2013
 
Type Article
 
Identifier 2074-6652
УДК 662.74: 66.028
http://ea.donntu.edu.ua/handle/123456789/18414
 
Relation Наукові праці ДонНТУ;Серія: Хімія і хіміна технологія, 2013. - Вип.1(20). - С.173-178
 
Publisher Донецк, ДонНТУ