An Innovative Solution to Reduce a time of Develo-ping of the Mine Excava-tion’s Technological Parts
|
|
Creator |
Shkumatov, Alexander
Moroz, Oleg Ivanchishin, Dmitry Proskurin, Aleksiy Мороз, Олег Кузьмич |
|
Subject |
coal mine
excavation develop mine excavation |
|
Description |
In coal mines of Ukraine per 1 km of mine excavations that aie being constructed, it is necessary to prepare up to 7 mines' connections. This requires the construction of the same number of technological parts. They are no long, but need from 1 up to 3 months to be created or 10% of general developing period.
In coal mines of Ukraine per 1 km of mine excavations that aie being constructed, it is necessary to prepare up to 7 mines' connections. This requires the construction of the same number of technological parts. They are no long, but need from 1 up to 3 months to be created or 10% of general developing period. |
|
Date |
2014-09-29T14:36:22Z
2014-09-29T14:36:22Z 2013 |
|
Identifier |
1234-5342
http://ea.donntu.edu.ua/handle/123456789/27438 |
|
Publisher |
Budownictwo Gornicze i Tunelowe” Kwartalnik naukowotechniczny, 2013, №3. Wydawnictwo Gornicze.Sp. z o.o., Katowice, Poland,58 str.
|
|